Barnard Temporary Bridge Work Progressing

October 17, 2011

in Barnard,News,Recovery Update


Photo by Robert Crean
This temporary bridge is coming along, north of Barnard. It’s built from the back and pushed out over the brook.

facebooktwittermail

Leave a Comment


7 + = eight

Please leave these two fields as-is:

Protected by Invisible Defender. Showed 403 to 108,592 bad guys.

Previous post:

Next post: