Route 100A Bridge Complete, Nearly 10 Years Later

June 7, 2012

in Bridgewater,News

After nearly ten years the one lane bridge with the stoplight on Route 100A has now officially opened two lanes of traffic.
Wendy Jenne Photo

facebooktwittermail

Leave a Comment


seven + 4 =

Please leave these two fields as-is:

Protected by Invisible Defender. Showed 403 to 105,706 bad guys.

Previous post:

Next post: