Bowers Bridge In West Windsor, Ribbon Cutting

July 26, 2012

in News

A ribbon cutting ceremony to planned to celebrate the re-opening of the Bowers Covered Bridge on Saturday, Aug. 4 at 6 p.m.
In August of last year, the small bridge was knocked off its foundation by Tropical Storm Irene. New framing for the bridge was completed by late March.

To see a video on the bridge replacement – click here

For a Photo Gallery of the bridge – click here
and even more – click here

facebooktwittermail

Leave a Comment


five + = 7

Please leave these two fields as-is:

Protected by Invisible Defender. Showed 403 to 105,834 bad guys.

Previous post:

Next post: